Real Cedar Siding Installation
Cedar siding installation tips and information including flashing caulking roof and ground clearance and fasteners.
Real cedar siding installation. Siding up to 6 inches wide can be blind nailed with one siding nail per bearing toe nailed through the base of each tongue. Flashing is an important line of defense in controlling moisture in wall assemblies. Flashing intercepts and directs the flow of water away from the building to designed drainage paths. Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried.
For vertical siding installation stud walls require horizontal blocking lines or furring strips. Watch now siding installation tips. In horizontal application start at the bottom and work up with the groove edges facing downwards. Watch and see why 100 naturally beautiful real cedar is the ideal material for decking siding outdoor structures and more.
Before installing siding make sure that flashings are installed to prevent moisture from entering wall and roof spaces. For horizontal applications start with the bottom course and work up with the channels pointing upwards. Lap siding can be installed horizontally or vertically. The number of board spaces between the soffit and bottom of the lowest piece of siding at the foundation should be such that the overlap is as per the table.
Do not nail through overlaps.